Wednesday 25 December 2013

Sketches

        This is first time we learn the architecture lettering.
This is some sketches when doing the project 1(Personal logo).

Before draw the blue print in A3 cartridge paper,I practice in my sketchbook.

This is the assignment for RAG 161.

Here is the sketches during academic trip(Langkawi trip).

Monday 23 December 2013

Fotolog

                                                            LANGKAWI TRIP 2013












                                                   

                                                 FIRST TIME SITE VISIT IN SIARA 81





                            

                                             SITE VISIT(NEXT TO STUDIO BLOCK)






The life in RUS 104

  First of all,I would like to thanks all the studiomaster for giving us some useful

information.For first project,it is so tough for me to sketch my face(self-portrait),

because I never attend any sketching classes or drawing classes.I am try to ask

my studiomaster,my friends and research from internet to improve my drawing

skills.

  Besides,the second project is produce a black and white sketch of the

natural structure and coloured drawing of a man-made structure around the

USM main campus.In this project,I had learn how to apply the elements of

light,shadow and hatching.Then,third project is to create a free-form sculpture.

I could able to applying a suitable elements and principle in create a free-form

sculpture.

  Then,project 3b is produce a comfortable chair.It is a group project

that each group consist of 3 people.It is a challenges of designing a small structure

in combination of two object which is chair and table.After done the project 3b,

we have to continue with project 4 which is presentation drawing.We need to

draw a blue print,axonometric and perspective drawing.

  During this semester,I had go to siara 81 for site visit to complete my project 5.

The last but not least project is project 6.We form a new group that consist of

16 people.This project requires us to design and build an Amphitheatre stage.

This can enhance our creativity in design a unique yet practical one-space building

with the understanding of human physiology,ergonomic and comfort factor based

on basic knowledge.We are also build up our teamwork when doing the

amphitheatre stage.

  After submit the project 6.We all going to Pulau Langkawi

for academic trip and relax for awhile.I had learn many things in this studio,

HBP is a part of my journey and I wish I could able apply those knowledge in

my future work-INTERIOR DESIGN.

Project 8-Performance and awards night

PERFORMANCE & AWARDS NIGHT 2013

       We have to organize a closing ceremony to our one semester 'learning-by-doing'

studio life.The event involves a series of live performances by 7major-based groups,

    multimedia presentation, award giving ceremony, and a farewell dinner.The theme

           for the Performance Night is ‘The Lost Kingdoms’. In line with the theme,

          each major-based group should represent the specific Nusantara kingdoms.

                                      So,for interior design is SINGHASARI.







Project 7-Exhibition

                               
       Exhibition~It is part of our achievement from project 1 until now.The theme for

        exhibition is 'floating lines'.As a interior design students,we all discuss and decide use the

chair as our design concept.




I am so happy and feel great to see my project 1(self stewardship) and project 5(neighbourhood

elements) was placed on the board.

 

 

Project 6c-Amphitheatre stage model

The 'amphiturtle stage' is inspired by turtle.The qualities we take from the turtle is calmness,relax

nature and peaceful.The architectural aspect is modernism which use modern material as exterior

envelope.Beside that,we use transparent roof to explore the structure of the stage.


Woooo~~Finally~~We done it!!We have to submit our model in 'the drum' HBP.Early in the

morning,all of us go to studio and send the model to 'the drum' HBP.

Tuesday 26 November 2013

Project 6a-Amphitheatre stage design

This is the amphitheatre stage and this is a group work.Each group consist of 16 people.